Can Smath update/calculate only that something that has changed/updated?

Can Smath update/calculate only that something that has changed/updated? - without calculating again the hole page every time when a change was made - Messages

#1 Posted: 12/25/2024 8:33:49 PM
Cornel

Cornel

2 likes in 78 posts.

Group: User

Hi,

When I change something in the Smath sheet Smath calculates the hole page again every time I changed something, which is time consuming when having more calculations. I am wondering if Smath can be made to behave in such a way when changing something individually in the sheet Smath to calculate/update only that something that has changed?
  • New Posts New Posts
  • No New Posts No New Posts